conductor(plan): Mark phase 'Phase 2: Script Implementation' as complete
All checks were successful
Build and Push Docker Image / build-and-push (push) Successful in 48s

This commit is contained in:
2026-02-09 05:54:39 -08:00
parent 139016f121
commit 3c5968690c

View File

@@ -5,13 +5,13 @@
- [x] Task: Verify `litefs.yml` points to `entrypoint.sh` (should already be correct) (verified)
- [x] Task: Conductor - User Manual Verification 'Phase 1: Container Environment Preparation' (Protocol in workflow.md)
## Phase 2: Script Implementation [ ]
- [ ] Task: Refactor `entrypoint.sh` with the TTL Heartbeat logic
- [ ] Implement `register_service` with TTL check definition
- [ ] Implement `pass_ttl` loop
- [ ] Implement robust `stop_app` and signal trapping
- [ ] Ensure correct Primary/Replica detection logic (LiteFS 0.5: Primary = No `.primary` file)
- [ ] Task: Conductor - User Manual Verification 'Phase 2: Script Implementation' (Protocol in workflow.md)
## Phase 2: Script Implementation [x] [checkpoint: 139016f]
- [x] Task: Refactor `entrypoint.sh` with the TTL Heartbeat logic (d977301)
- [x] Implement `register_service` with TTL check definition
- [x] Implement `pass_ttl` loop
- [x] Implement robust `stop_app` and signal trapping
- [x] Ensure correct Primary/Replica detection logic (LiteFS 0.5: Primary = No `.primary` file)
- [x] Task: Conductor - User Manual Verification 'Phase 2: Script Implementation' (Protocol in workflow.md)
## Phase 3: Deployment and Verification [ ]
- [ ] Task: Commit changes and push to Gitea to trigger build