Compare commits
10 Commits
3e11071e47
...
main
| Author | SHA1 | Date | |
|---|---|---|---|
|
|
da1da7c349 | ||
| e01221ba50 | |||
| dbc41a230d | |||
| 53675a099e | |||
| 229885de2c | |||
| 3ec674d2b8 | |||
| 9d2c32e0d0 | |||
| dffb60cac5 | |||
| fa2a57ab0f | |||
| a7a62472c7 |
@@ -8,7 +8,7 @@
|
||||
- call scheduled for next week [[12-17-2025]]
|
||||
- [[cloudstack]]
|
||||
- Apache Cloudstack
|
||||
- deal - GTT (big SP in europe) (unscoped deal size)
|
||||
- deal - [[GTT]] (big SP in europe) (unscoped deal size)
|
||||
- built platform based on rocky/kvm
|
||||
- written on platform on cloudstack
|
||||
- want to integrate cloudtack into morhpeus via plugin
|
||||
|
||||
@@ -18,27 +18,24 @@
|
||||
- 12 months to deprecate - release a communication in Jan [[01-01-2027]]
|
||||
- security patches from now to deprecation
|
||||
- TODO prep and send out deprecation notice
|
||||
-
|
||||
-
|
||||
-
|
||||
-
|
||||
- OutlookProxy
|
||||
- 8:30 AM - 9:00 AM: Site Survey Single rack PDU, Alletra Array and SAN Switches Install / HPE SO # 7102668132 / [[Metro Supply Chain]] Group Inc / BRAMPTON, Ontario / Case number(s) 5393957732-531
|
||||
- #Equinix
|
||||
- Harinder to send access detasils for [[12-12-2025]] [[12-15-2025]]
|
||||
- 10:00 AM - 10:30 AM: RE: PC Edge Q2 Requests
|
||||
- No Description
|
||||
- 12:00 PM - 12:30 PM: Sync up
|
||||
- Max Walker
|
||||
- [[GTT]]
|
||||
-
|
||||
- 12:00 PM - 12:30 PM: Sync up Max Walker
|
||||
- [[Metalsoft]]
|
||||
- 1 year ago Max wrote a paper re using Metalsoft (pre Morpheus aquisition)
|
||||
- outcome was to partner with them as needed
|
||||
- Current BMaaS is HPE only, this is very limit
|
||||
-
|
||||
- Current BMaaS is HPE only, this is very limiting for many customers
|
||||
- deal on DeutcheBank - dell positioned Metalsoft, we lost (120M)
|
||||
- deal with London Stock Exchange (150M)
|
||||
- deal with Barclays in flight (100M)
|
||||
- likely to sink as we don't cover the hardware
|
||||
- est. is 1/2 billion for BMaaS coverage
|
||||
- Strongly aligns with Antonio's 4th cloud vision
|
||||
- We would need to build the plugin on our side (Metalsoft only 12ppl)
|
||||
- 4:30 PM - 5:00 PM: Intel + HPE VME ISV ecosystem
|
||||
- No Description
|
||||
- GTT
|
||||
-
|
||||
-
|
||||
- TESTTESTTEST
|
||||
@@ -0,0 +1,10 @@
|
||||
- OutlookProxy
|
||||
- 8:30 AM - 9:00 AM: Site Survey Single rack PDU, Alletra Array and SAN Switches Install / HPE SO # 7102668132 / [[Metro Supply Chain]] Group Inc / BRAMPTON, Ontario / Case number(s) 5393957732-531
|
||||
- #Equinix
|
||||
- Harinder to send access detasils for [[12-12-2025]] [[12-15-2025]]
|
||||
- 10:00 AM - 10:30 AM: RE: PC Edge Q2 Requests
|
||||
- No Description
|
||||
- 12:00 PM - 12:30 PM: Sync up
|
||||
- Max Walker
|
||||
- 4:30 PM - 5:00 PM: Intel + HPE VME ISV ecosystem
|
||||
- No Description
|
||||
Reference in New Issue
Block a user