Compare commits

...

10 Commits

Author SHA1 Message Date
Stent
da1da7c349 [logseq-plugin-git:commit] 2025-12-11T17:41:16.775Z 2025-12-11 09:41:17 -08:00
e01221ba50 [logseq-plugin-git:commit] 2025-12-11T17:13:56.732Z 2025-12-11 09:13:56 -08:00
dbc41a230d Auto saved by Logseq 2025-12-11 09:12:58 -08:00
53675a099e Auto saved by Logseq 2025-12-11 09:11:58 -08:00
229885de2c Auto saved by Logseq 2025-12-11 09:10:58 -08:00
3ec674d2b8 Auto saved by Logseq 2025-12-11 09:09:58 -08:00
9d2c32e0d0 Auto saved by Logseq 2025-12-11 09:08:58 -08:00
dffb60cac5 Auto saved by Logseq 2025-12-11 09:07:58 -08:00
fa2a57ab0f Auto saved by Logseq 2025-12-11 09:06:58 -08:00
a7a62472c7 Auto saved by Logseq 2025-12-11 09:05:58 -08:00
3 changed files with 21 additions and 14 deletions

View File

@@ -8,7 +8,7 @@
- call scheduled for next week [[12-17-2025]]
- [[cloudstack]]
- Apache Cloudstack
- deal - GTT (big SP in europe) (unscoped deal size)
- deal - [[GTT]] (big SP in europe) (unscoped deal size)
- built platform based on rocky/kvm
- written on platform on cloudstack
- want to integrate cloudtack into morhpeus via plugin

View File

@@ -18,27 +18,24 @@
- 12 months to deprecate - release a communication in Jan [[01-01-2027]]
- security patches from now to deprecation
- TODO prep and send out deprecation notice
-
-
-
-
- OutlookProxy
- 8:30 AM - 9:00 AM: Site Survey Single rack PDU, Alletra Array and SAN Switches Install / HPE SO # 7102668132 / [[Metro Supply Chain]] Group Inc / BRAMPTON, Ontario / Case number(s) 5393957732-531
- #Equinix
- Harinder to send access detasils for [[12-12-2025]] [[12-15-2025]]
- 10:00 AM - 10:30 AM: RE: PC Edge Q2 Requests
- No Description
- 12:00 PM - 12:30 PM: Sync up
- Max Walker
- [[GTT]]
-
- 12:00 PM - 12:30 PM: Sync up Max Walker
- [[Metalsoft]]
- 1 year ago Max wrote a paper re using Metalsoft (pre Morpheus aquisition)
- outcome was to partner with them as needed
- Current BMaaS is HPE only, this is very limit
-
- Current BMaaS is HPE only, this is very limiting for many customers
- deal on DeutcheBank - dell positioned Metalsoft, we lost (120M)
- deal with London Stock Exchange (150M)
- deal with Barclays in flight (100M)
- likely to sink as we don't cover the hardware
- est. is 1/2 billion for BMaaS coverage
- Strongly aligns with Antonio's 4th cloud vision
- We would need to build the plugin on our side (Metalsoft only 12ppl)
- 4:30 PM - 5:00 PM: Intel + HPE VME ISV ecosystem
- No Description
- GTT
-
-
- TESTTESTTEST

View File

@@ -0,0 +1,10 @@
- OutlookProxy
- 8:30 AM - 9:00 AM: Site Survey Single rack PDU, Alletra Array and SAN Switches Install / HPE SO # 7102668132 / [[Metro Supply Chain]] Group Inc / BRAMPTON, Ontario / Case number(s) 5393957732-531
- #Equinix
- Harinder to send access detasils for [[12-12-2025]] [[12-15-2025]]
- 10:00 AM - 10:30 AM: RE: PC Edge Q2 Requests
- No Description
- 12:00 PM - 12:30 PM: Sync up
- Max Walker
- 4:30 PM - 5:00 PM: Intel + HPE VME ISV ecosystem
- No Description