Files
LogSeq/journals/2024_03_25.md
2025-12-11 06:26:12 -08:00

9 lines
438 B
Markdown

- [[Ketamine Clinics]]
- Equinx - Network SLAs
- Discussed various options for the SLA (between 99.5 and 99.95).
- Scope = Equinix Fabric port -> ToR switch
- Justin/James to explore SLIs for the Fabric port, etc.
- Open Q: What is Equinix's SLA for the various digital services we are reselling, and how we might measure those
- Stu/Jeff to connect with Pinto on response times for the support team.
SCHEDULED: <2024-03-27 Wed>
-