Files
FitTrack_GarminSync/specs/004-home-sstent-projects/data-model.md

15 lines
778 B
Markdown

# Data Model: Sync Job Management with Progress Tracking
## Entity: SyncJob
Represents the state and progress of the single active synchronization process.
### Attributes:
* `status` (string): Indicates the current state of the sync. Possible values: "idle", "in_progress", "completed", "failed".
* `progress` (float): Completion percentage, ranging from 0.0 to 1.0.
* `start_time` (datetime): Timestamp when the sync operation began.
* `end_time` (datetime, optional): Timestamp when the sync operation concluded (either completed or failed).
* `error_message` (string, optional): Contains details if the sync operation failed.
* `job_type` (string, optional): Indicates the type of data being synchronized. Possible values: "activities", "health", "workouts".