Files
silverbullet-icalendar/test_space_e2e/index.md
sstent 90ab92421a
Some checks failed
Build SilverBullet Plug / build (push) Has been cancelled
feat(test): implement Playwright E2E and Dockerized testing infrastructure
2026-02-21 13:19:37 -08:00

464 B

.iCalendar: Sync

Meetings for Jan 20th, 2026.iCalendar: Sync

.

.iCalendar: Sync .iCalendar: Sync

${template.each(query[[ from e = index.tag "ical-event" where e.start:startsWith("2026-01-20") order by e.start ]], function(e) return string.format("* %s to %s: %s (TZ: %s)\n", e.start:sub(12, 16), e["end"]:sub(12, 16), e.summary, e.timezone or "UTC") end)}

Welcome 👋

Welcome to the wondrous world of SilverBullet.