Files
LogSeqDB/logseq/bak/journals/2025_05_05/2025-12-10T17_56_58.174Z.Desktop.md
2025-12-11 06:26:12 -08:00

1.8 KiB

  • ((681686ce-6f02-4405-84ab-6a0aa7ca92b7)) id:: 681686ce-6f02-4405-84ab-6a0aa7ca92b7
  • ((681686f5-3024-4680-8b70-a7f8f7f07b85))
  • ((6816870d-b7de-48ce-b3c0-397f3478aaba))
  • https://hpe-my.sharepoint.com/:p:/p/tilman_walker/EREKFHvhWn1EmFjy1C31_u4BsHZnTIVqhuInJUCCQqnARQ?e=JaQQXj
  • Tillman 1:1
    • DONE connect with Chris Kinsler completed:: 06-05-2025
    • DONE connect with Rambo completed:: 06-05-2025
    • ISV /integrations program
      • ISV validation into the hypervisor
      • Rambo wong looking into the morpheus
      • HVM integrations/cetifications
        • image.png
        • Middle column - SAP still coming, they are draggin their feet
        • data prot
          • Cohesity/Netbackup/Veeam - agent based no real issues
          • commvault - image based backup -
          • DataProt API coming - snapshots, track changed blocks, etc
            • definition in flight with Dave Estes
            • no date for release
        • VDI
          • basic - can run :) nothing more
            • omnissa
            • citrix
            • hp anywhere
          • to come
            • vGPU support
            • no engineering commit date yet
            • each tool needs various extra integrations
              • omniassa needs power control
            • Citrix not that interested yet
              • awaiting more deals to drive
            • Hp Anywhere not really engaged
        • Some a re alliances
          • some HPE complete - under storage
            • e.g. data prot
          • Tillman teams = databases
          • hpe compute tend to own this

  • Tanu 1:1 id:: 6814dcc7-6319-4582-8c00-642a273286ab
    • Career goals
      • Seat at the table
      • Stategic focus rather than tactical
      • less cat herding / project management
      • TCP path
    • Brian Wheeler / David / Tommy

  • PCE Integrations Design Guidelines
  • ((6818e04b-e120-4f6c-bb55-1dd297399127))