962 B
962 B
- Terraform #call
- 0.4.0 rreleased 12-11-2025
- 0.5.0 on track for Jan
- long pole is QA testing
- 3 resources have tests (out of 80)
- Sundari's team is now responsible for testing
- long pole is QA testing
- Metal instance testing
- network device state coming ack too verbose
- think they have a way to move forward (and return a list closert othe hCL ask)
- Volumes/Disk
- 1 vol defined = multiple returns
- bug with
- network device state coming ack too verbose
- OutlookProxy
- 8:30 AM - 9:00 AM: Site Survey Single rack PDU, Alletra Array and SAN Switches Install / HPE SO # 7102668132 / Metro Supply Chain Group Inc / BRAMPTON, Ontario / Case number(s) 5393957732-531
- #Equinix
- Harinder to send access detasils for 12-12-2025 12-15-2025
- 10:00 AM - 10:30 AM: RE: PC Edge Q2 Requests
- No Description
- 12:00 PM - 12:30 PM: Sync up
- 4:30 PM - 5:00 PM: Intel + HPE VME ISV ecosystem
- No Description
- GTT
- 8:30 AM - 9:00 AM: Site Survey Single rack PDU, Alletra Array and SAN Switches Install / HPE SO # 7102668132 / Metro Supply Chain Group Inc / BRAMPTON, Ontario / Case number(s) 5393957732-531