Files
LogSeqDB/journals/2025_12_11.md
2025-12-11 07:37:57 -08:00

735 B

  • Terraform #call
    • 0.4.0 rreleased 12-11-2025
    • 0.5.0 on track for Jan
      • long pole is QA testing
        • 3 resources have tests (out of 80)
      • Sundari's team is now responsible for testing
  • OutlookProxy
    • 8:30 AM - 9:00 AM: Site Survey Single rack PDU, Alletra Array and SAN Switches Install / HPE SO # 7102668132 / Metro Supply Chain Group Inc / BRAMPTON, Ontario / Case number(s) 5393957732-531
    • 10:00 AM - 10:30 AM: RE: PC Edge Q2 Requests
      • No Description
    • 12:00 PM - 12:30 PM: Sync up
    • 4:30 PM - 5:00 PM: Intel + HPE VME ISV ecosystem
      • No Description
      • GTT