Files
LogSeq/journals/2025_12_11.md
2025-12-11 09:12:58 -08:00

1.8 KiB

  • Terraform #call
    • Sundari's team is now responsible for testing
    • 0.4.0 released 12-11-2025
      • missed hpe_morpheus_instance data source
    • 0.5.0 on track for Jan
      • long pole is QA testing
        • 3 resources have tests (out of 80)
    • Metal instance testing
      • network device state coming ack too verbose
        • think they have a way to move forward (and return a list closert othe hCL ask)
      • Volumes/Disk
        • 1 vol defined = multiple returns
        • bug with 2 vols request, 1 of them gets create, the other gets created and disappears
    • Old provider
      • when to deprecate?
        • need to define migration path
        • 12 months to deprecate - release a communication in Jan 01-01-2027
          • security patches from now to deprecation
          • TODO prep and send out deprecation notice
  • OutlookProxy
    • 8:30 AM - 9:00 AM: Site Survey Single rack PDU, Alletra Array and SAN Switches Install / HPE SO # 7102668132 / Metro Supply Chain Group Inc / BRAMPTON, Ontario / Case number(s) 5393957732-531
    • 10:00 AM - 10:30 AM: RE: PC Edge Q2 Requests
      • No Description
    • 12:00 PM - 12:30 PM: Sync up Max Walker
      • GTT
      • Metalsoft
        • 1 year ago Max wrote a paper re using Metalsoft (pre Morpheus aquisition)
          • outcome was to partner with them as needed
          • Current BMaaS is HPE only, this is very limiting for many customers
          • deal on DeutcheBank - dell positioned Metalsoft, we lost (120M)
          • deal with London Stock Exchange (150M)
          • deal with Barclays in flight (100M)
            • likely to sink as we don't cover the hardware
          • est. is 1/2 billion for BMaaS coverage
        • Strongly aligns with Antonio's 4th cloud vision
    • 4:30 PM - 5:00 PM: Intel + HPE VME ISV ecosystem
      • No Description