first commit
This commit is contained in:
9
journals/2024_03_25.md
Normal file
9
journals/2024_03_25.md
Normal file
@@ -0,0 +1,9 @@
|
||||
- [[Ketamine Clinics]]
|
||||
- Equinx - Network SLAs
|
||||
- Discussed various options for the SLA (between 99.5 and 99.95).
|
||||
- Scope = Equinix Fabric port -> ToR switch
|
||||
- Justin/James to explore SLIs for the Fabric port, etc.
|
||||
- Open Q: What is Equinix's SLA for the various digital services we are reselling, and how we might measure those
|
||||
- Stu/Jeff to connect with Pinto on response times for the support team.
|
||||
SCHEDULED: <2024-03-27 Wed>
|
||||
-
|
||||
Reference in New Issue
Block a user